Botley Road bridge walkway under construction
Botley Road walkway closure 9 and 10 March
This weekend (Saturday 9 and Sunday 10 March) between 10pm and 8am, access through the current temporary walkway on Botley Road will be intermittently closed.
The closure is to allow Network Rail to safely remove the footbridge from across the road, as part of the ongoing redevelopment of Oxford Station. Alternative routes and travel will be signposted by marshals in the area.